null

STS-62A Vandenberg Space Shuttle Go For Mate Patch

(No reviews yet) Write a Review
SKU:
10473
MPN:
10473
Width:
3.50 (in)
Height:
4.00 (in)
Depth:
0.08 (in)
Backing:
Sew On
Edging:
Merrowed Edge
  • Rounded triangle STS-62A Go For Mate patch with a shuttle external tank between two boosters on a launch mount over a red field.
  • GO FOR MATE - NASA STS-62A Mission patch measures 3.5 inches wide by 4 inches tall
$9.95
Frequently bought together:

Description

At Vandenberg's Space Launch Complex 6, the space shuttle was to be put together on the launch pad itself, and mating the external tank to the two solid rocket boosters was the step that turned two tall columns into a launch vehicle. That step is GO FOR MATE. The first flight planned from the pad was STS-62A, with Discovery headed for a polar orbit in 1986. It would have been the first shuttle launch from the West Coast. This patch carries the mission number, 62A, and that milestone.

The mission number itself tells the story. In the shuttle numbering of the time, the 6 stood for fiscal year 1986, the 2 for Vandenberg as the launch site and the A for the first flight in that slot. Robert Crippen was assigned to command, with Guy Gardner as pilot, Mike Mullane, Jerry Ross and Dale Gardner as mission specialists, and Pete Aldridge and Brett Watterson as payload specialists. The prime payload was Teal Ruby, an infrared sensor experiment for future early-warning satellites, flying with the CIRRIS infrared telescope. From November 1984 to May 1985 the test orbiter Enterprise was mated to a tank and boilerplate boosters at SLC-6 to prove the pad could do the job, and the complex was declared operational on 15 October 1985.

The patch is a rounded triangle about 3.5 inches wide and 4 inches tall, with a black merrowed border around a wide white band. STS-1V runs up the left side, Mission 62A down the right and GO FOR MATE across the bottom in heavy black letters. Inside, on a red field, the big external tank stands between the two boosters on the launch mount, all three outlined in black thread. The orbiter is not there yet; this is the stack waiting for it. It is a sew-on patch, ready to be stitched to a jacket, vest or flight bag.

The loss of Challenger on 28 January 1986 grounded the fleet, and the Vandenberg shuttle never flew. The program went into caretaker status on 31 July 1986, and the Air Force formally ended it on 26 December 1989. The site that crews called Slick Six had first been built for the Manned Orbiting Laboratory in the 1960s, and after the shuttle it launched Athena and Delta IV rockets. Three of the 62A crew, Guy Gardner, Ross and Mullane, later flew together on STS-27. The work done at SLC-6 in the mid-1980s is a chapter of the shuttle program that only the people who were there saw up close.

It fits a shadow box beside its companion Go For Stack patch and a photo of Enterprise stacked on the pad at Vandenberg. It is also a good gift for someone who worked Slick Six in the 1980s. STS-62A stayed on the ground, but the stack was ready.

View AllClose