Description
The first Milstar satellite left Space Launch Complex 40 at Cape Canaveral on February 7, 1994, on a Titan IV with a Centaur upper stage. Milstar was built to give the U.S. military secure, jam-resistant communications anywhere in the world. Its satellites were cross-linked, passing traffic from one to the next in orbit with no need for relay stations on the ground. This patch marks that first launch, with STARNET FIRST LAUNCH around a globe and MILSTAR across the bottom. The gold satellite at the top is a Milstar.
That first spacecraft, DFS-1, was catalogued as USA-99 and flew on Titan IV vehicle K-10 in the 401A configuration. It was a Block I satellite with a Low Data Rate payload of 192 EHF channels, and Milstar I reached initial operational capability in July 1997. DFS-2 followed in November 1995. The Block II satellites added a Medium Data Rate payload running from 4,800 bits per second to 1.5 megabits per second. Six Milstar satellites were launched between 1994 and 2003, and five reached their operational orbits after a Centaur problem stranded DFS-3M in a low orbit in April 1999. Lockheed Martin built them, and the 4th Space Operations Squadron at Schriever ran them.
The patch is cut to its own outline, about 4.5 inches across, with a light blue border that follows every edge. STARNET, FIRST and LAUNCH run around a white ring in red letters. Inside is a blue globe with a black grid and the Americas in green. The gold satellite with its long solar wings crosses the top, and a white launch vehicle climbs toward it on a yellow flame. MILSTAR is stitched in light blue over a bar of red and white stripes, with a big four-point star behind it that drops below the circle, and the patch has a sew-on backing.
Milstar became the joint-service backbone for Defense Department strategic and tactical communications. Its terminals let units on land and at sea pass data in real time, even to cruise missiles and other compatible weapons. Redundant command and control was built in for high survivability. The system carried that load until August 2010, when control moved to the Advanced EHF program, and the two Block I satellites were still listed as operational in 2025. All of it started with the launch on this patch.
It fits a shadow box with Titan IV, Cape Canaveral and space operations patches, or the jacket of someone who worked Milstar in the 1990s. It is also a good gift for a family member who spent years on military satellite communications. One launch, and a network that followed.