Description
Titan IV B-26 launched from Space Launch Complex 4E at Vandenberg Air Force Base on October 19, 2005, and it was the 368th and last Titan ever launched. The family began with the Titan I test program in the late 1950s, and the patch counts the years as 1959 to 2005. Forty-six years later the line ended on the California coast with a National Reconnaissance Office payload, NROL-20, catalogued as USA-186. This patch is the closing line on that whole history. THE LAST OF THE TITANS is stitched along the border, and it means exactly that.
The Titan II, marked T-II on the patch, stood alert in missile silos until 1987 and flew all twelve of NASA's Gemini launches in the mid-1960s. The Titan III, the T-III, added strap-on solid boosters and carried reconnaissance satellites, Viking and Voyager. The Titan IV, built by Lockheed Martin near Denver, flew 39 times, and B-26 was a Titan IVB in the 404B configuration. SLC-4E hosted twelve Titan IV launches between March 8, 1991 and October 19, 2005, and B-26 was the last of them. Six months earlier, B-30 had launched the final Titan from Cape Canaveral, so October 2005 closed the program on both coasts. The pad is now leased by SpaceX for Falcon 9.
The patch is about 4 by 4 inches, a black disc set on a big upward-pointing triangle, with a gray stitched border that follows every point and notch on a clean cut edge. A white Titan IV with its two solid boosters stands in the middle under T-IV, among white stars and a wire-frame globe. THE LAST OF THE TITANS runs in gold up the left side, and 2SLS NRO LMSSC SMC runs down the right, for the 2nd Space Launch Squadron, the National Reconnaissance Office, Lockheed Martin Space Systems Company and the Space and Missile Systems Center. B-26 is stitched large in gold, with T-II and T-III at the lower corners and 368TH TITAN, 1959, 2005 between them. SLC-4E and VAFB sit at the bottom on either side of the Air Force symbol. It has a hook backing for a loop panel on a bag, jacket or plate carrier.
Every Titan was launched by people who knew the rocket by heart, from the ICBM crews of the early 1960s to the launch squadrons of the 2000s. When B-26 cleared the tower, their work on it was done. The patch lists the launch squadron, the customer, the builder and the program office together, because all of them were in it to the end. It is a farewell more than a mission patch.
It belongs in a shadow box with a Titan II or Titan III patch, or on the range bag of someone who worked a Titan launch at Vandenberg or the Cape. It also makes a good gift for a parent who spent years on the Titan program and saw the last one fly. Forty-six years, 368 launches, one last rocket.